The Graduation & Milestone Planner 2027
Customize your planner Every book is printed to order — these choices are included
Want your own cover? Choose Custom Design under Cover above — it adds $40.00 and the book is a softcover. Want the hardcover too? Choose Hardcover + Custom Design. Either way, tell us what you would like and we design it and email you a proof before we print.
Printed as your cover title, exactly as you type it, with “Planner” beneath. Leave blank for the plain JOT cover. The pages inside stay undated either way.
A plain cover still carries the title, the timeframe and the back panel — it just leaves off the artwork. Either way costs the same.
Make it yours — e.g. “Sam’s Planner” over “one day at a time”. Printed exactly as you type it, on the cover and on the title page inside. Leave either blank to keep what the design shows.
Custom covers are made to order and add a little extra time. We send a proof before we print.
Your two starter modules are checked by default — uncheck them if you would rather use the room for something else. Only the modules you pick are printed.
Five is our cap, so tabs work best as sections — Reference, Months, Weeks, Logs, Notes. Included at no extra cost.
Everything you pick above is included at this price. Shipping and any tax are added at checkout.
A plan that runs backward from the date — three months out, six weeks out, two weeks out, and afterward — so the venue, the regalia and the announcements are ordered before the sizes sell out. Alongside a full dated planner.
The announcement list with addresses, sent, invited and RSVP in one place. A gift log with a note-written column, so you can see at a glance which thank-you notes are still owed. And a day-of checklist. Works for any milestone, not just May.
- Choose 3, 6, 12 or 18 months
- Choose softcover or hardcover — both wire-bound — or add a custom-designed cover
- US Letter (8.5" × 11"), full color throughout
- 70 lb matte paper, made for writing on
- Dated pages — you choose the month it starts
- Free US shipping, sent direct to you
Free to customize: start month and year, Sunday or Monday weeks, weekly pages on or off, a blank notes page each month, up to five labeled tab dividers, your wire color, and your name on the title page. Set it all just above Add to Cart — see what you can change.
Made to order — each planner is printed after you order it. Please allow up to 7 business days for production before it ships.